Aladağ Wind Energy Production Industry. And Trade. Inc. Kuyulukoyak RES 16 has been producing energy uninterruptedly since 2020, using MWe power and the wind in the high parts of Konya.
Makres Solar Power Plant started in April 2017 in Alanya district of Antalya and along with the Energy Transmission Line, the facility with a power of 5,830 kWp / 5,000 MWe was put into operation within 4 months.
Within KC Electricity Production Inc. Başköy Regulator and HES Project, our facility located in the Araç stream in Kastamonu, is under construction.
Within the scope of the solid waste project carried out by the association of establishing and operating solid waste facilities of the local governments of Trabzon and Rize provinces: Separate collection of packaging waste in Trabzon & Rize.